All ALBI products are available within
24 hours from a nationwide distributor network.
Contact Rentokil Initial Supplies on
0151 546 5131 to find your local stockist.
It is our policy, wherever possible, to deliver all
UK mainland orders placed before 12.00 noon,
the next day (except Saturday).
STORAGE
ALBI coatings should be stored between 15°C (59°F) and 25°C (77°F).
GETTING STARTED
- Check site conditions
- The building must be weather tight and all wet trades completed
with sufficient time allowed for drying out before applying ALBI
MAX. Particular attention should be paid to the internal
conditions where the work is being carried out i.e. minimum
temperature of 18°C and maximum relative humidity of 70%
during the entire application and drying period. Should the site
fail to meet these conditions the installation of electric heaters
and/or de-humidifiers should be used to achieve these
conditions. Adequate ventilation during the application procedure
is essential, especially when the product is being used in
confined spaces. If this is not possible the appropriate respirator
must be used.
- Is the moisture content of the timber acceptable?
- The maximum moisture content of the timber substrate must be 14%.
- Has the timber been correctly prepared?
- Remove existing finishes by mechanical abrasion or the
appropriate varnish stripper and clean the surface with cellulose
thinners and/or a slightly damp cloth. It is essential that all
surfaces are clean and free from surface moisture and any
contamination such as oil, grease and wax. Highly absorbent
timber should be lightly wiped over with a clean water/liquid
detergent mix prior to the application of the first coat of
ALBI MAX BASECOAT. Avoid excessive wetting. All surfaces should
be sanded prior to application of the coating to ensure adequate
penetration and long term adhesion.
APPLICATION OF ALBI MAX BASECOAT
Stir product well - do not thin. There are three methods
for applying ALBI MAX BASECOAT:- Application
by brush allows access to those awkward corners. Whilst
roller application is faster it may require laying off by brush
(we recommend the use of short pile, lambswool rollers).
Airless spray can be used for large flat areas, coverage being
achieved by repeated passes. The following information is
a guideline only which may need to be modified to suit
local conditions. To achieve the required working viscosity
ALBI MAX BASECOAT should be heated to 30-40°C in a water bath,
heating cabinet or similar. Remember to loosen the lid! Up to
6.6m²/litre may be achieved in a single coat when spraying.
Allow each coat to dry for 24 hours at a constant air temperature
above 18°C, and relative humidity of
not more than 70% before applying a further coat. For best
results de-nib with flour grade glass paper between coats
and before overcoating. Plastic containers must be used
for the coating when applying the ALBI MAX BASECOAT. Clean
brushes and equipment with a mixture of warm water/10% acetic
acid (household vinegar).
ALLOW 24 HOURS (MINIMUM) DRYING TIME BETWEEN
COATS, AND A FURTHER 24 HOURS DRYING TIME ONCE
FINAL COAT APPLIED.
APPLICATION OF ALBI OVERCOAT
ALBI MAX BASECOAT must be completely dry prior to applying
the ALBI OVERCOAT.
Stir well - do not thin. Apply by brush or short pile roller in one
even coat. It is essential to maintain the wet edge otherwise
joints may show. In areas where heavy wear is likely to occur,
a further coat of ALBI OVERCOAT should be applied for
maximum protection. Metal containers must be used for the
coating when applying ALBI OVERCOAT. Clean brushes and
equipment with cellulose thinners. It is not recommended to
spray the ALBI OVERCOAT.
APPLICATION PROCEDURE FOR HIGH HUMIDITY SPECIFICATION
- Ensure the correct site conditions are achieved and maintained - see Getting Started
- Seal the reverse face, end grains and edges of the timber with two coats of ALBI OVERCOAT (gloss)
- Fix the timbers and allow them to stabilise in position
achieving the moisture content expected in service life (no
greater than 14%). This avoids sealing excessive moisture into
the timber which may subsequently cause a breakdown in the ALBI MAX system.
- Apply a compatible stain if desired and allow at least a week to dry
- Apply the ALBI MAX BASECOAT as per the application rate table
- Apply two coats of ALBI OVERCOAT in the preferred finish (matt, satin or gloss) at 12m²/litre
Timber coated in the ALBI MAX system should be allowed at least one
week to dry out before being subject to high humidity.
In the case of swimming pools, the pool should not be filled until
at least two weeks after application has been completed and the
central heating system is in full operation.
TREATMENT OF TIMBER OFF-SITE, PRIOR TO FIXING
Where project requirements involve application of the ALBI MAX
system off-site, the following method of application must be
followed to ensure that premature breakdown of the coating does
not occur.
- Make sure the application instructions have been read
thoroughly by everyone involved in applying the product. Ensure
the correct site conditions are achieved and maintained - see
Getting Started.
- Seal the reverse face, end grains and edges of the timber with
two coats of ALBI OVERCOAT gloss finish.
- Apply the ALBI MAX BASECOAT to the front face of the timber.
- Apply one coat of ALBI OVERCOAT (required finish) to the
front face. The final coat should be allowed to dry thoroughly for
two weeks before transportation to site.
- When transporting to site tape the boards together with
release paper in between them to prevent adhesion
- Once the timber is on site and fixed in position, apply a further
coat of ALBI OVERCOAT to the front face.
PROBLEM SOLVING
ALBI MAX BASECOAT is sensitive to moisture and failure to follow the application
instructions may result in a breakdown of the system, typical symptons being crazing,
blooming or failure to cure/dry. Where deterioration of the ALBI MAX system has occurred the
system should be redecorated, dependent on the cause of the problem, as follows:
- FAILURE TO CURE/DRY
- This problem is often the result of incorrect application
conditions. It is essential that the correct site conditions are achieved i.e. minimum
temperature of 18°C and maximum relative humidity of 70% during the entire application
and drying period.
- LIGHT SURFACE BLOOMING/MINOR SURFACE DAMAGE
- The ALBI OVERCOAT should be thoroughly cleaned with a damp rag; stubborn or greasy marks can be
removed using methylated spirits.
- BLOOMING/CRAZING IN THE ALBI MAX BASECOAT (SEVERE DAMAGE)
- When this
occurs the whole system will need to be removed. The ALBI OVERCOAT should be
stripped by swabbing with cellulose thinners and the ALBI MAX BASECOAT by mechanical
abrasion. The ALBI MAX system should be re-applied in accordance with the instructions
on this website.
MAINTENANCE
Correctly applied, maintenance of the ALBI MAX system should normally
take place in line with the internal re-decoration schedule
of the building. At this point the ALBI OVERCOAT may require
re-applying in order to maintain its decorative, protective
properties. This can be done by cleaning the surface thoroughly
with a damp rag; stubborn or greasy marks can be removed
using methylated spirits. Apply one coat of the ALBI OVERCOAT.
Rentokil Initial Approved List of Stains
| Product |
Manufacturer |
| Johnstones Woodworks Matt Finish Woodstain |
Kalon Decorative Products |
| Ronseal Quick Drying Woodstain |
Ronseal Ltd |
| Sadolin Classic |
Akzo Nobel Woodcare Ltd |
| Dulux Trade Protective Woodsheen |
ICI Paints |
| Sikkens Cetol HLS |
Akzo Nobel Coatings Plc |